Thursday, September 20, 2012

Signage @ LRT Dang Wangi

Signage yang dipasang di LRT Putra Dang Wangi dari 11.30 malam dan siap dipasang pada 14hb September 2012 @ 5.30 pagi.

Sebelum signage dipasang


Base - welding
1st board
Signage Installed @ Dang Wangi LRT Station
2nd board
 


3rd Board



Signage installed @ LRT Dang Wangi


No comments:

Post a Comment